The shipping platform

manage your shipping data, trade and automate work-flows
Moji (Japan)
JPMOJ UN LOCODE
33.9666° / 131.0000° Latitude / Longitude

Port Restrictions

Max draft: 10.8

Max LOA: 270

Max DWT: 57,000

Channel Depth: 12

Anchorage Depth: 23

Mean Tide: 3.17

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Moji is situated on the N coast of Kyushu facing the Kanmon Strait which separates Kyushu and Honshu. General overview: The Port of Moji is a significant part of the Kitakyushu port complex and is equipped to handle all types of cargo traffic, including bulk, containers, petroleum, and general cargo. In addition to its cargo handling capabilities, the Port of Moji is also a well-known tourist destination. Its potential as a sightseeing hub is highlighted by the numerous attractions and travel opportunities it offers visitors. It operates during daylight hours only. Handling Equipment: - Gantry Cranes - Floating Cranes - Straddle Carriers - Freezer Outlets - Pneumatic Suckers Storage: - Warehouses - Transit Sheds - Stock Yards Traffic figures: Approx. 89,000,000t of cargo handled annually. Load line zone: Summer. Kanmon Bridge: Max Air Draught 61m.

SERVICE PROVIDERS

Port Agency

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • Passenger
  • Dry Dock
  • Bunkering
  • Ro-Ro
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Fri 11
forecast-image
15 - 24°C
14 km/h
NNEarrow
%
Sat 12
forecast-image
14 - 24°C
7.6 km/h
NNEarrow
%
Today
forecast-image
17 - 23°C
11.9 km/h
ESEarrow
0%
Mon 14
forecast-image
19 - 25°C
26.3 km/h
SEarrow
0%
Tue 15
forecast-image
22 - 25°C
26.6 km/h
SEarrow
84%
Wed 16
forecast-image
20 - 24°C
16.6 km/h
NNEarrow
89%
Thu 17
forecast-image
19 - 26°C
12.6 km/h
NNEarrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
MEIUN GT
Position9957919 / MPP

1,600 MT

2022

Osaka
10/10/2024 09:46
Kure
10/12/2024 23:00
KOYO
Position9099236 / CONT

1,438 MT

2006

Moji
10/12/2024 12:53
Hibikinada
10/13/2024 07:00
KOYU MARU
Position9712242 / MPP

820 MT

2014

Moji
10/5/2024 03:06
Oiu
10/12/2024 21:00
SHOYO MARU NO.18
Position8889660 / BULK

1,303 MT

1995

Oita
10/2/2024 03:14
Moji
10/2/2024 22:00
ISHIN
Position9852236 /

2,450 MT

2018

Mitajiri
10/10/2024 12:56
>
10/12/2024 00:30
KOSHIN MARU NO.13
Position9597460 / TANK

999 MT

2011

Hakata
10/10/2024 22:05
Kanmon Ko
10/11/2024 17:05
SEIYO MARU
Position9447380 / TANK

1,881 MT

2007

Sakai
10/10/2024 02:19
Matsuyama
10/13/2024 05:30
SHOSEN MARU
Position9930820 / TANK

1,124 MT

2021

Shimonoseki
10/12/2024 12:58
Iwakuni
10/13/2024 00:00
MAPLE FORTITUDE
Position9587178 / BULK

32,480 MT

2011

Incheon
10/10/2024 17:45
Himeji
10/13/2024 07:00
CARBONIAN FAITHBOND
Position9691278 / TANK

575 MT

2013

Shimonoseki
10/12/2024 14:26
Kanmon Ko
11/10/2024 16:30
TSUKI MARU NO.11
Position9100578 / TANK

1,082 MT

1994

Hakata
10/2/2024 13:07
Kanmon Ko
10/12/2024 07:00
YUHO MARU NO.5
Position9608142 / TANK

1,658 MT

2011

Moji
10/12/2024 12:58
Ulsan
10/13/2024 19:00
SHOYO MARU
Position9370898 / BULK

1,400 MT

2005

Shimonoseki
10/12/2024 12:53
Mutsure
10/16/2024 00:30
KEIYO MARU NO.8
Position9715907 / TANK

1,772 MT

2014

Moji
10/3/2024 13:52
Kanmon Ko
10/8/2024 00:00
FUJITAKA MARU
Position9660190 / TANK

1,136 MT

2013

Iwakuni
10/6/2024 11:33
Bandar Anzali
10/12/2024 20:00
KEIYU MARU NO.5
Position9924821 / MPP

2,350 MT

2020

Shimonoseki
10/2/2024 13:07
Kanmon Ko
10/12/2024 03:00
SHUO MARU
Position9677272 / TANK

1,604 MT

2013

Hirohata
10/10/2024 01:25
Kanmon Ko
11/12/2024 23:00
AM BREMEN
Position9566473 / BULK

56,155 MT

2012

Hakodate
10/3/2024 06:10
Fukuyama
10/13/2024 03:00
SANNOU NO.5
Position9739159 / MPP

2,400 MT

2014

Yatsushiro
10/10/2024 12:59
Ishinomaki
10/15/2024 12:00
KANNA MARU
Position9470234 / BULK

1,710 MT

2009

Higashi-Harima
10/8/2024 02:40
Kanmon Ko
10/12/2024 18:40
KUNIMI MARU
Position9950349 / MPP

1,730 MT

2022

Hamada
10/10/2024 13:01
Kanmon Ko
10/12/2024 21:00
HOUMANZAN MARU
Position9815874 / BULK

3,449 MT

2018

Kanda
10/12/2024 12:52
Yatsushiro
10/14/2024 01:30
SITC TOYOHASHI
Position9834014 / CONT

12,336 MT

2018

Tokyo
10/10/2024 08:22
Dangjin
10/13/2024 13:30
FERRY KURUSHIMA
Position8625179 / PASSCAR

2,612 MT

1987

Matsuyama
10/3/2024 19:13
Kem
10/13/2024 05:00
JINHUA 16
Position9250880 / MPP

2,100 MT

2001

Bayuquan
10/9/2024 13:30
Yokkaichi
10/14/2024 16:00
SHOTO MARU
Position9658824 / BULK

2,150 MT

2012

Kobe
10/7/2024 12:48
Kanda
10/11/2024 09:00
WAKAMATSU MARU
Position9473602 / MPP

6,500 MT

2008

Shimonoseki
10/6/2024 06:48
Kanda
10/10/2024 13:00
NISSHO MARU
Position9912476 / TANK

915 MT

2021

Keihin
10/9/2024 05:06
Anegasaki
10/14/2024 17:00
KUROSHIO MARU
Position9251066 / BULK

7,296 MT

2001

Yokohama
10/9/2024 07:25
Ube
10/12/2024 04:40
SUN EASTERN
Position9323302 / MPP

6,726 MT

2005

Pyeongtaek
10/8/2024 08:30
Dangjin
10/11/2024 04:00
HOSEKI MARU
Position9073426 / BULK

609 MT

1993

Matsuyama
10/10/2024 02:35
Kanmon Ko
10/12/2024 09:00
ATAGOSAN
Position9770608 / BULK

243,399 MT

2019

Kashima
10/7/2024 01:01
Tobata
10/10/2024 18:48
MING HE
Position9147057 / MPP

1,600 MT

1996

Fukuyama
10/10/2024 12:56
Rongcheng
10/15/2024 07:00
SHOYO MARU NO.3
Position9499527 / MPP

1,050 MT

2008

Kokura
10/12/2024 02:35
Kanmon Ko
10/12/2024 16:45
WINDS 3
Position9775206 / MPP

11,759 MT

2016

Tanjong Pagar
9/25/2024 12:40
Kanmon Ko
10/10/2024 17:00
TATSUMI MARU NO.1
Position9832860 / BULK

1,942 MT

2018

Higashi-Harima
10/9/2024 03:27
Kanda
10/12/2024 09:20
V TAURUS
Position9496161 / MPP

33,193 MT

2010

Onsan
10/8/2024 09:05
Hibikinada
10/8/2024 18:00
HOZEN MARU
Position9251133 / TANK

4,992 MT

2001

Hannan
9/22/2024 22:03
Sakaiminato
10/12/2024 16:40
BORACAY ISLAND
Position9760641 / MPP

38,443 MT

2015

Hakata
10/5/2024 09:00
Kominato
10/9/2024 05:00
SEISYU MARU
Position9767651 / MPP

2,350 MT

2015

Kitakyushu
10/12/2024 00:59
Kanmon Ko
10/13/2024 13:30
MOUNT RAINIER
Position9336799 / BULK

32,815 MT

2005

Lanshan
9/24/2024 21:46
Kanda
10/8/2024 02:00
KAIZANMARU
Position9739173 / BULK

2,200 MT

2015

Hakata
10/11/2024 07:53
Kanda
10/11/2024 23:30
NITTOKU MARU
Position9894038 / MPP

1,650 MT

2020

Akita
10/9/2024 22:52
Kanda
10/12/2024 02:00
TAIZAN
Position9918468 / MPP

850 MT

2021

Ube
10/6/2024 02:44
Kanda
10/12/2024 18:00
KIYO MARU NO.6
Position9805051 / TANK

2,140 MT

2017

Nagoya
10/7/2024 01:38
Kikuma
10/13/2024 08:00
HIKOSAN MARU
Position9726188 / BULK

2,301 MT

2014

Shimonoseki
10/6/2024 14:39
Kanda
10/12/2024 09:00
KIRISHIMA MARU
Position9671254 / BULK

1,266 MT

2013

Komatsushima
10/10/2024 02:13
Kanda
10/11/2024 05:00
MIYABI MARU
Position9890379 / MPP

1,670 MT

2019

Niihama
10/10/2024 14:33
Tokyo
10/14/2024 23:00
RYUSHO MARU NO.5
Position9597329 / TANK

599 MT

2010

Iwakuni
10/10/2024 01:02
Ube
10/12/2024 22:00
HIMAWARI
Position9739094 / BULK

3,802 MT

2014

Tachibana
10/2/2024 06:12
Matsushima
10/14/2024 23:00
CORESKY OL
Position9692741 / BULK

34,302 MT

2015

Wakamatsu
10/12/2024 14:27
Yokohama
10/15/2024 06:00
SHINPUKU MARU NO.23
Position9746322 / MPP

1,720 MT

2015

Hakata
10/12/2024 08:05
Chofu
10/14/2024 20:00
HEKISEI MARU
Position9880972 / MPP

1,730 MT

2020

Wakamatsu
10/12/2024 02:33
Himeji
10/13/2024 15:30
YUTAKA MARU NO.7
Position9115327 / BULK

1,653 MT

1995

Kanda
10/12/2024 12:52
Hanshin
10/15/2024 06:00
NOSHIMA
Position9860714 / BULK

63,340 MT

2020

Niihama
10/10/2024 12:57
Ube
10/11/2024 13:30
CASTELLANI
Position9602409 / BULK

82,050 MT

2014

Port Waratah
9/18/2024 05:35
Ube
10/5/2024 02:00
SOUKAKU
Position8990196 / MPP

1,584 MT

2004

Oita
10/10/2024 01:04
Ube
10/12/2024 17:00
YUTAKA MARU NO.10
Position9725366 / BULK

1,946 MT

2014

Komatsushima
10/10/2024 03:55
Kanda
10/12/2024 07:30
KOUZAN MARU
Position9510826 / BULK

22,053 MT

2010

Tokyo
10/10/2024 09:10
Ube
10/12/2024 15:30
HINOMINE
Position9556296 / MPP

2,340 MT

2009

Ube
10/9/2024 01:51
Ube
10/12/2024 06:30
RYOYU MARU
Position9873993 / TANK

890 MT

2019

Osaka
10/10/2024 22:16
Ube
10/12/2024 08:30
SEIZAN MARU
Position9176199 / BULK

5,714 MT

1998

Matsusaka
10/10/2024 05:28
Ube
10/12/2024 09:00
CP 5001
Position9629263 / MPP

3,689 MT

2012

Hibikinada
10/11/2024 13:41
Hibikinada
10/12/2024 16:00
SHOKOU MARU
Position9798454 / MPP

850 MT

2017

Ube
10/7/2024 00:24
Ube
10/12/2024 07:00
HOKUSHIN
Position9925100 / MPP

1,730 MT

2019

Hibi
10/10/2024 01:05
Ube
10/12/2024 08:00
SHINTAIYO MARU
Position9893474 / MPP

1,350 MT

2020

Ube
10/12/2024 02:32
Sakata
10/15/2024 00:00
SS JIN
Position9354155 / MPP

3,302 MT

2005

Tahara
10/1/2024 12:19
Sakai
10/14/2024 20:00
ATLANTIC BRIDGE
Position9351115 / CONT

8,691 MT

2007

Busan
10/11/2024 14:45
Hiroshima
10/12/2024 10:00
YOSHU MARU NO.7
Position9700615 / BULK

4,998 MT

2014

Tokuyama
10/11/2024 13:44
Imari
10/12/2024 08:00
AQUAMARINE SW
Position9597666 / MPP

37,119 MT

2012

Chiba
10/7/2024 07:40
Gwangyang
10/10/2024 16:30
YUHO
Position9424716 / TANK

1,935 MT

2008

Yokkaichi
10/10/2024 06:42
Kanazawa
10/14/2024 08:30
FUOU MARU
Position9367798 / CAR

6,598 MT

2006

Tokyo
10/10/2024 10:00
Tokyo
10/13/2024 23:00
MEIZAN MARU
Position9296676 / BULK

1,720 MT

2003

Kakogawa
9/25/2024 03:00
Ube
10/12/2024 11:30
DONGJIN FIDES
Position9247302 / CONT

10,712 MT

2002

Busan
10/11/2024 15:15
Hakata
10/13/2024 06:30
NAN LIAN 18
Position9883156 / TANK

5,487 MT

2019

Osaka
10/11/2024 04:50
Onsan
10/13/2024 02:00
HE ZHONG 2
Position9711896 / TANK

2,439 MT

2016

Osaka
10/8/2024 03:54
Taizhou
10/14/2024 01:00
HIKARI MARU
Position9691022 / MPP

1,300 MT

2013

Kudamatsu
9/13/2024 18:49
Tokuyamakudamatsu
10/12/2024 11:45
SITC YANTAI
Position9639622 / CONT

12,691 MT

2012

Nagoya
10/11/2024 10:24
Tianjin Xingang Pt
10/15/2024 01:30
RENOWN
Position9301110 / CONT

11,179 MT

2005

Hakata
10/10/2024 21:33
Shanghai
10/13/2024 01:00
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
9/30/24 - 10/14/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
9/30/24 - 10/14/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/10/24
Construction Vehicle
150 MT/450 CBM
Poland
11/1/24 - 11/24/24
Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/10/24
Construction Vehicles
150 MT/450 CBM
Germany
11/1/24 - 11/10/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/15/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismantled Construction Vehicle
150 MT/450 CBM
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Dismounted Construction Vehicle
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
Germany
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Construction Vehicle (dismantled)
150 MT/450 CBM
11/1/24 - 11/24/24
Reactor
1,300 MT/2,431 CBM
3/1/25 - 3/31/25
Project and General Cargo
19,000 MT/17,347.3 CBM
Guam
9/1/25 - 11/30/25
Connecting to SHIPNEXT Network...